Short answer / Leadership
Burn rate is the average monthly spend, usually over the last three months. Runway is the money left divided by the burn rate, in months. On a grant with a fixed end date, compare the runway with the months left in the term: a runway longer than the term means the grant is under-spending, not that it is safe.
On 31 August our example lab's grant has £14,423.80 left, six months to run, and enough money for 7.8 months at the rate it's spending. That's not the good news it sounds like.
Burn rate and runway are the two numbers everyone quotes about money, and both are averages of the past pointed at the future. On a grant with an end date they answer a different question from the one a company asks: not whether the money lasts, but whether the work will use it in time. Below is how I'd work them out, one grant and one project that each give the wrong answer, and what the lab decided at its August review.
What are burn rate and runway?
Burn rate is what you spend in an average month; runway is the money left divided by it, in months. The arithmetic is trivial. The choices inside it aren't.
Which months. Three is the usual window, the current month included. One month is too jumpy, and twelve is still reporting a spending pattern you changed in spring.
Which money. For a whole lab I'd count the unspent allocation, as in how to track a lab budget across grants and projects. For one grant I count everything left in it, contingency included, because all of it has to be spent or handed back by the end date.
It's the range estimate on a car's dashboard: fuel left over the last few miles' consumption. Tow a trailer up one hill and the range falls by far more than the fuel you used, because the estimate assumes you'll tow it all the way home.
One grant, three months in
The example lab is a small biotech moving its HEK293 cells into serum-free suspension, and then into a 2 L bioreactor. A £20,000 process development grant pays for both, from 1 June 2026 to 28 February 2027, including bench time.
| Month | Spend | What |
|---|---|---|
| June | £965.10 |
Medium, flasks, slides, and bench time for nine runs |
| July | £566.80 |
Medium, flasks, and bench time for nine runs |
| August | £4,044.30 |
Four 2 L vessels and a probe kit, £3,390.00; routine passages |
| Total | £5,576.20 |
Burn is £5,576.20 / 3 = £1,858.73 a month. What's left is £20,000 − £5,576.20 = £14,423.80, so runway is £14,423.80 / £1,858.73 = 7.8 months.
The grant ends in six. A runway longer than the term means the money outlasts the grant. To spend it by 28 February the grant has to average £2,403.97 a month from here, 29% more than it's burning now.
How do you tell if a grant is under-spending?
Compare what it has spent with a straight line from its start date to its end date. The Burn page in CCA Labs draws that line for any fund, spending its total evenly across its term.
On 31 August the grant is 91 days into 272, 33.5% of its term. The line says £6,691.18 should be gone. £5,576.20 is, so Variance to Plan is −£1,114.98, "burning slower than plan". The band either side of the line is 5% of the fund's total, £1,000 here, so the grant reads Under-burning. Beyond the band the other way it would read Burning Fast, and past its total, Over Budget.
There's a blunter check on the Budget page as well. A grant at least a quarter through its term whose spend lags the time elapsed by more than 25 points gets a "grant under-spending" warning under Needs attention. This one lags by 5.6 points, so it stays quiet. That's right: the Burn page is for catching a drift early, and the warning is for the grant nobody has looked at since spring.
Why is under-burning a problem?
Because on a grant it's usually late work, not saved money. This one is slow for a reason the budget can't see: the adaptation slipped three weeks at 0.5% serum, and the bioreactor runs that would spend most of the grant can't start until the adapted cells are banked, now due on 16 October.
The instinct is to spend to catch up with the line. I'd resist it. Money spent to hit a line buys things nobody planned, and the line was never a plan in the first place, just the simplest shape anyone could draw.
What does the forecast at term say?
About 91% of the programme's money, which looks right and is right by accident. The programme page's Forecast at Term adds the burn for every whole calendar month to the latest end date among the funds the programme owns. The grant ends last, so that's six months: £6,499.00 + 6 × £1,858.73 = £17,651.40 (the page works from the unrounded burn), 91% of its £19,500 draw. The £6,499.00 includes the March media screen, paid from internal money.
But most of August is one order. The forecast assumes a £3,390.00 order every month until February. Take it out of the average and the burn is £728.73, and the forecast £10,871.40, 56% of draw. Neither figure knows about the bioreactor runs that haven't started, each planned at £1,762.70. For that you need a forecast from planned work: Forecast under Budget takes released workflows and how often each will run, and projects the cost.
A runway alarm that wasn't
Do the same sum for the adaptation project on its own and it looks broke. It has £813.80 of its £3,000 left and has spent £728.73 a month, so its runway is 1.1 months. The money runs out in early October, and the project ends on 21 October.
It doesn't need a top-up. What's left is 14 passages to mid-October, and the medium and flasks for them, about 1.8 litres and 48 flasks, were bought in June, July and August and are on the shelf. The new cash is bench time, 14 × £24.00 = £336.00, and a £38.50 pack of cryovials for the bank: £374.50. A runway counts money. It can't see stock.
CCA Labs doesn't draw a runway per project; the Budget page's runway is for the whole lab. The project's health check looks at projected spend against its allocation instead, and that stays quiet here, correctly.
Where it goes wrong
Lumps. A trailing average treats one purchase as a habit for three months, then forgets it all at once. On 1 November, when August leaves the window, the vessels' £1,130 a month drops out of this grant's burn overnight, and nothing at the bench has changed.
Stock. Money becomes stock before it becomes results, so a project that buys in bulk looks like it's running out while its shelves are full.
Straight lines. The Burn page spends a grant evenly. Real grants often buy equipment early and run experiments late, so under-burning in the third month of a scale-up grant can be the plan working. Read it next to the project dates.
Two kinds of runway. The Burn rate & runway tool in the bench calculators works out months of runway from cash, spend and revenue: the company's bank balance, not a grant. Both get called runway. Say which you mean.
What the review decided
On 31 August the head of R&D, the two scientists and the lab manager go through the programme:
- Accept the re-plan: the adaptation's milestones on 4 September, 25 September and 16 October, the first 2 L run on 18 December and the final runs by 26 February.
- No top-up for the adaptation. Its runway alarm is stock on the shelf.
- Hand back the media screen's unused
£1,577.20. Its allocation goes down to£922.80in Edit Project, and the programme's draw falls to£17,922.80. - A trigger, not a guess: if three stable passages without serum aren't done by 25 September, ask the funder in October for a no-cost extension of the end date.
- Give the SOP goal two milestones, 20 November and 18 December, so it can report progress.
- Take the process scientist's other project down to 10% from October.
Nobody decided to spend faster.
How CCA Labs shows burn and runway
The Budget page shows Spend, the trailing three-month average with its change, and Runway, the months left for the whole lab, the month it runs out and a status: Short under three months, Watch under six, Healthy at six or more. Burn compares each fund with its straight line.
The programme page shows its own spend, here up about 504% on the quiet three months before, and Forecast at term. Forecast projects cost from the work you plan to run. All of it comes from the same cost entries that orders and experiments create, so the project, the fund and the programme agree.
You can see your own funds against their lines when you create your lab. The budget tools are on the all-in-one lab page.
The review ends where the programme began, with the split. The £1,577.20 goes back to the internal fund, unallocated, and someone has to decide where it goes next. That's where this story began: how to split one budget across programmes and projects.
The whole story / one floor at a time
One programme's year, from the budget split to the August review
One example programme, followed through a small biotech: getting HEK293 cells to grow in suspension without serum, then in a 2 L bioreactor. Leadership splits two funds across three projects and sets the goals, one project slips three weeks, the bench counts what each run costs, and the August review shows what the slip did to a grant with a fixed end date. Each part is written for the people on that floor.
FAQ / asked about this
Frequently asked questions
- What is the difference between burn rate and runway?
- Burn rate is how fast money is spent, usually the average monthly spend over the last three months. Runway is how long the money left lasts at that rate: the balance divided by the burn rate, in months. Burn is a speed, and runway is the distance left at that speed.
- Is under-spending a grant a problem?
- Often, yes. A grant usually has a fixed end date, and money not spent by then may have to go back unless the funder agrees an extension. Under-spending also tends to mean the work is late, which matters more than the money. Check what your grant's terms allow.
- Why does one large purchase distort the burn rate?
- A three-month average treats a one-off order as if it will repeat every month for three months. In the example, a £3,390 equipment order in August lifts the grant's burn from £728.73 to £1,858.73 a month, and any forecast built on that average expects another one every month.